Started installing the sub floor.
After the sub floor was completed it was time for the walls to start going up. It had to be the hottest week I can remember in a long time, it was still in the 80's at 6 in the morning and reaching mid 90's by lunch. This really slowed down the productivity due to all the fluids we had to stop and drink.
Until next time,
Tim